The Lily Pad Island Fixture features sculptural white discs arranged along a gently curved brass branch, creating a flowing botanical silhouette above the room. Multiple suspension cables keep the fixture balanced while preserving its light, floating appearance. Soft illumination glows between the layered elements, making it an elegant statement light for dining tables, kitchen islands, and contemporary living spaces.

Lit, small bulbs glow openly among the ceramic discs along the branch, casting soft pools of light rather than one central source – a light, botanical piece for a long dining table, kitchen island, or open living space, offered in two lengths.

Elegant Brass S-Curved Glass Lily Pad Island Fixture Details

  • Materials: Metal, iron, ceramics Body
  • finish: Gold Shade
  • finish: White
  • Light source: LED bulb or Edison bulb, G4 base
  • Voltage: AC 110–240V
  • Mounting: Ceiling, multi-cable suspension Wiring: Hardwired Moisture resistance: IP20,; generally suited to indoor use where it won't be exposed to moisture Cable length: 59″, adjustable and can be lengthened as required

Size

L 47.2″ x W 15.7″ x H 13.8″ L 59.1″ x W 15.7″ x H 13.8″

Color

Gold & White

Lighting & Performance

AUVIELIGHT ceiling lamp for kitchen island. Review the light source, dimensions and finishes above to choose the right fixture.

Elegant Brass S-Curved Glass Lily Pad Island Fixture | AUVIELIGHT$665.00 USD

Shop With Confidence

Clear Product Information

Certification and compatibility details vary by product and are available on the product page or upon request.

30-Day Returns

Eligible items may be returned within 30 days in accordance with our Return & Refund Policy.

Shipping Protection

Eligible orders may qualify for a replacement or refund if a package is lost or arrives damaged.

Energy-Efficient Lighting

Many of our designs feature efficient LED technology for beautiful, dependable everyday illumination.